Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING. <br />Mine Site Evaluation <br />State Program <br />1. Permittee/Person 9. Permit Number 10. Permit Type <br /> <br /> SENECA COAL COMPANY C-082-94 PP <br /> 2. Address 11. Field Visit Date 12. Propose 13. SRA Present <br /> P.O. BOX 670 05/26!2005 O~ ^Y <br />3. Ci 4. State mm-dd -yyyy <br /> <br />CO 14. Permit Status 15. Site Status 16. Facility T e <br />Ha den A~ ~ AD <br />5. Zip Code 6. Phone Number <br /> I7. OSM Office # 18. CCID # 19. Land Code <br />81639 (970) 276-3707 140 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.HA ID # 21. State Abrev. 22. County Name <br /> ROUTT <br />~ <br />Mi <br />N CO <br />ne <br />ame <br />8. <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />YOAST MINE <br />25. Hours <br />2,p a. Permit Review 26. Sim a~ture Block <br />'~1 27. Rev'ewing O cial: <br />~~~~ <br /> <br />p b. Site Visit Time <br />7 Sign tore: ~ I z U S- Signature: <br />, HENRY AUSTIN H) # 116 <br />' <br />l Ti <br />T Review Date: ~ / 3 / ~ O o5 <br />g,p c. <br />rave <br />me Printed Name: <br /> mm - dd - yyyy <br />2,p d. Report Writing Date: 06/02/2005 Is Supplemental MSE Page Used Y/N Y~ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral {non site visit) <br />Oxx„..Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions GCF..,. Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is when a state inspector accompanies an OSM inspector anytime during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11{g <br />ppermitted but not yet disturbed. ABt.. Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inadive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiatetl. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting PPhose bond release. actions to revoke the permit, collect the <br />rf <br />b <br />ti <br />C <br />l <br />l <br />ti <br />d <br />d/ <br />l <br />l E <br />ti <br />ormance <br />(s), an <br />oa <br />ora <br />on opera <br />on <br />or rec <br />ama- <br />xplora <br />on: <br />exp <br />ons TC..Tempomry Cessation: The R4 has granted pe <br />EX..Coa <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 8161 lion of forfeited site is in progress. <br />have not begun. 817.131 (b). FR.. Forfeited and Reclaimed: Forfeiture <br />t Ph <br />l <br />l <br />1 <br />P <br />I R <br />l <br />t l <br />I b <br />d <br />l <br />ti <br />l <br />t <br />i <br />d <br />eas <br />ease rec <br />ama <br />on comp <br />ng: Coa <br />surface mining P <br />... <br />hase <br />ease: A <br />ase <br />on <br />re <br />e <br />e <br />AP.. Active Coal Produc <br />e <br />. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is Permitted but there is no bond. <br />facilittyy such as tipple or preporation plant. P2.. Phase II Release: At least Phase II bond release WC.W~idcat: Coal mining and reclamation <br />i <br />f <br />d <br />ti <br />h <br />ki <br />i <br />i <br />i <br />d <br />ons <br />ve, site <br />or the entire perm <br />tte <br />area. opera <br />ave or are ta <br />ng place an <br />t Status is act <br />s <br />NM..No Mining: The Perm <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activny, and site not regraded. the RA has released all bond. required ermifs from the RP.. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, andlor Rails) H... Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent fo Explore under 30 CFR786.26 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Apiculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments fro <br />small businesses about Federal agency enforcement actions. The Ombudsman wdl annually evaluate the enforcement activities and rate each asenc 's <br />responsiveness to small business. If you aze a small business (a business with S00 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-8R8-REG-FAIR (I-R88-734-3247). xn~iud necemher4, isss <br />