Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Backfill & Gradine <br />Backfill and Grading was completed by November 2004 for the area of the Neck Pit designated <br />for 2004. To ensure compliance, soil should be redistributed at this location this summer to <br />accommodate fall seeding. Some erosion is occurring in the re-graded spoil in the Neck Pit area. <br />SCC plans to construct apost-mine drainage channel in this portion of the Neck Pit. In <br />accordance with the reclamation schedule, permanent channel construction including riprap <br />installation should be completed within one year of completion of the final grading of adjacent <br />backfill slopes. SCC has indicated that the plans for channel construction will be submitted with <br />the upcoming Permit Revision No. 2 submittal. <br />