INSPEC15485
DRMS
>
Back File Migration
>
Inspection
>
INSPEC15485
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:52 PM
Creation date
11/18/2007 9:11:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980020
IBM Index Class Name
Inspection
Doc Date
12/19/2001
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
12/18/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 001 <br />Date : 12/19/2001 <br />User: ALA <br />Agency or organization name : DMG <br />Permit or other job action :Final Reclamation <br />Task description : Re-Grade Asphalt and Concrete Stockpiles <br />HOURLY EQUIPMENT COST <br />State :Colorado Permit/job# : M-1980-020 <br />County :Douglas Abbreviation : none <br />Site :Braley Pit Filename : M020-001 <br />Basic machine :Cat D10R - IOSU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Cost Breakdown <br /> Utilization <br />Ownership cosVhour : $63.63 NA <br />Operating cosVhour : $125.73 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cosVhour : $27.99 NA <br />Total unit cosUhour : $217.35 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume: 10,000 LCY <br />Swell <br />factor: NA <br />Source of estimated volume :Estimate <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION <br />Average push distance : 100 feel <br />Unadjusted hourly production : 1,718.9 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 5,200 feet <br />Material weight : 2,600 Ibs/LCY <br />Weight description <br />Limestone -Broken <br />JOB TIME AND COS7 <br />Fleet size : 1 Dozers) <br />Unit cost : $0.160 /LCY <br />R9YZ35 <br />Loose <br />volume : 10,000 LCY <br />Condition Correction Factors Source <br />Operator skill : 1.00 (excl.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUdal <br />Spoil pile : 0.90 (ssd-tc) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : i.00 (Cat HB) <br />Material weight : 0.88 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.79 <br /> <br />Adjusted unit production : 7362.54 LCY/hr <br />Adjusted fleet production : 1,362.54 LCY/hr <br />Total job time : 7.34 Hours <br />Total job cost : $1,595 <br />Horsepower : 570 <br />Shitt basis : 1 per day <br />Data source : (CRG) <br />