My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC15402
DRMS
>
Back File Migration
>
Inspection
>
INSPEC15402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:48 PM
Creation date
11/18/2007 9:10:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
Inspection
Doc Date
6/19/2003
Doc Name
Inspection Report
From
DMG
To
M.A. Concrete Construction Inc.
Inspection Date
5/13/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER -ONLY WORK <br />Task # <br />Date <br />User <br />Agency or organization name:DMG <br />02a State :Colorado <br />06Po92003 County:Mesa <br />SSS Site :Monument View Gravel Pit <br />Permit or other job action :Routine Bond Recalculation <br />Task descdption :Remove Road and facilities area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Breakdown : Job utilization °~ Horsepower : 490 <br />Ownership cosVhour : $72.62 NA Weight (UST) : 56.34 <br />Operating cosUhour : $110.00 100 Cast data source : (CRG) <br />OperatorcosUhour: $30.84 NA <br />Total and cosUhour : $21348 Total fleet cosVhour : $428.92 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 8.873 <br />Model :Cat 633E Sedes 2 <br />Swell Loose <br />LCY factor: NA volume: 8,873 LCY <br />Source of quantity take-off : Exhibit D <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Hauling Capacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 23.20 LCY <br />Matedal description : Heaped volume : 34.00 LCY <br />Gravel -Dry Average volume : 28.80 LCY <br />Rated payload : 82, 000 pounds <br />Payload capacity : 32.16 LCY Adjusted capacity : 28.80 LCY "' <br />Cvcle Time (load + haul + soread + return) : ~ Loading time : 0.90 minutes' <br /> Maneuver and spreatling time : 0.70 minutes <br />Travel time : • wearq nme per peiron pusn-pun mWela <br />Route Distance (feet) Grade (%) Roll. res.(°k) Total res.(°k) Velocity (fpm)~ Travel time (min.) <br />Haul : 400 -2.5 5.0 2.5 2,173 0.18 minutes <br />Return: 400 2.5 5.0 7.5 1,453 0.28 minutes" <br />"Navel Time adjustetl for acwleralbn ervl tleceleretian al IoaO end dump polyds <br />,wouna. era ate. anaMawe par lor:al reeinarKa 9rb»n, ~ averaoe Total cycle time : 2.08 minutes <br />Job Condhion Correction Factors <br />Site altitude (feet) : 4,550 Adiusted Houdv Production <br />Ahitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 833.26 LCY/Hour"' <br />Job efficiency factor : 0.83 (1 shiNday) Adjusted unR production : 691.61 LCYMour <br /> Adjusted beet production : 1,383.22 LCYMour <br />Net job Cer2dien factor : 0.83 ^' ~ limes voNme on push-purl moeela <br /> <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) Total job time : 8.41 Hours <br />Unit cost : $0.309 /LCY Total job cost : $2, 739 <br />Pennitlob # : M-2000-032 <br />Abbreviation :none <br />Filename : M032A2a <br />SUIfdC@ <br />
The URL can be used to link to this page
Your browser does not support the video tag.