Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-2000-032 <br />INSPECTION DATE 5-13-2003 <br />INSPECTOR'S INITIALS SSS. CBM <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible. <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 ~ Toos_, oil stockpiles around the site are not stabilized as reouired <br />O6 / 30 / 2003 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): TS <br />Indicate measures to be taken to stabilize topsoil stockp_~iles as reeuired by Rule 3.1.9. Include a <br />timeframe for these measures to be completed. <br />2. Backfilling__to maintain a maximum 3 acres is not occurring as gp . -ifi -d in th . mining_and <br />reclamation Ip ans rP~ing in insuffirient reclamation bond being held for reclamation of this site. OS / 18 / 2003 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): BG <br />Complete backfillingQ thep~ until no more than 3 acres of open.~t area are left as specified in the BS_ F11 - <br />apgroved reclamation plan or submit a technical revision application to incorporate this revised mining <br />and reclamation method into thepermit and submit additional financial warranty as calculated by <br />3. Protection of Permanent man-made structures is not being maintained as committed to in the mine <br />To ensure the stability of structures north of and adjacent to the north permit boundan~the operator <br />must complete backfilling of the north highwall . to a grade no steeper than 3H:1V by no later than <br />June 30. 2003. Submit ohotoc~raohic evidence of compliance. to DMG. by June 30. 2003. <br />06 / 30 / 2003 <br />PB or PV: PB <br />TOPIC(S): MP <br />1, Steve Shuey, hereby certify that on June 19, 2003, I deposited a true and complete copy of this foregoing inspection report in <br />the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, and to those <br />others within the body of this report who have been designated to receive copies (DMG personnel excepted). <br />Signature <br />