Laserfiche WebLink
'~olorado Division of Minerals and Geology • <br />ESTINATIH6 FORM - EAUIPNENT MOBILIZATION / DEMOBILIZATION <br />Task 1... 5 Prep. by SSS Filename..N165-5 <br />sheet 1 of 2 <br />Date..... 22-Feb-95 Permit F M-66-165 Mine......Nillow Bend <br />Permit Action........ 110 bond recalculation <br />Task Description..... Transport equipment to/from Site <br />HOURLY EAUIPMENT COST <br />-----=-----=-=-----== NOTE -This is a list to select hom, not a list of mandatory items t¢ include. <br />Mob/Deaob Eqp . -Tract or : 6z4, 15,000 lb GVN, 375 HP, diesel Poaered <br /> -Lt. Trailer 25 ton folding gooseneck, drop deck <br /> -Med. Trailer : 50 ton folding gooseneck, drop deck <br /> -Hvy. Trailer : 120 Ton folding gooseneck, drop deck <br /> -Pilot Car On-highway light duty truck, 4z2, 130 hp, 1/2 ton rating, gasoline po erect <br /> -Hyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 fip,t ft. boom <br /> -Fuel Truck : 6x4, 3,600 gallon capacity, 210 HP, diesel Poaered <br /> -Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 20,000 lb GVN, 115 NP, diesel Poaered <br />Last Update: ................................ .......... ................ ........... .... .......... <br />Hay, 1941 <br />""""""" " Lt. Rig Med.P,ig Nvy.Rig Pilot Hydraulic Fuel Lub Flatbed <br />Cost Breakdown: <br />--------------------- (=25 T. <br />---------- 25-50 T. ) SO T. Car <br />----------------------------- Crane <br />---------- Truck <br />---------------- Truc <br />------------ <br />---- Truck <br />--------- <br />Ownership Cost/hr = 526.18 529.16 537.74 51.39 E19.89 56.02 E10.6 56.10 <br />Operating Cost/hr = 523.23 524.76 529.92 S4.D5 523.40 516.19 520.7 f7.41 <br />Operator Cost/hr = 520.54 220.54 520.54 519.81 520.86 519.97 519.9 519.97 <br />Helper Cast/hr = 519.81 519.81 f19.81 50.00 50.00 50.00 50.0 50.00 <br /> Total = 540.36 594.21 5108.01 525.25 564.15 542.18 551.3 534.14 <br />NON-ROADABLE EAUIPMEN T: <br />"""""" """"" Height Dwnerstiip Haul Rig Fleet Size Haul Trip Aet.urn Tr p DDT Permit <br />Machine Desc ription (tons) Cost,,/hr Cost/hr fno. hau led) Cost/hr Cost/hr Cost/ea <br />CAT 926E 10.45 512.38 590.36 1 5102.14 590.3 <br />Revegetation equipment 20.00 520.00 590.36 1 5110.36 590. <br />Subtotals 5213.10 5180.7 50.00 <br />