My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC15279
DRMS
>
Back File Migration
>
Inspection
>
INSPEC15279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:42 PM
Creation date
11/18/2007 9:10:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985043
IBM Index Class Name
Inspection
Doc Date
9/3/2002
Doc Name
Corrective Action
From
Rocky Mountain Premix Inc.
To
DMG
Inspection Date
6/20/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 -, <br />~.. R~~ <br />~lROCRY MOUNTAIN ~~ <br />PREMIX, INC. <br />1910 Rand Avenue <br />Colorado Springs, CO 80906 <br />RECEIVED 8-30-02 <br />sEP o 3 zooz -~ <br />James Dillie ~ Division of Minerals and Goolo <br />Colorado Division of Minerals & Geology gy <br />Re: Inspection Report: RCQ 6-20-02 ~ <br />Jim, ~ ~jn Cf1'/.Y tlcsD~S ~ tl~E ~ ti-G -(~~-~'~ <br />G~ F, R~Iti°'7 L rJ2 ~-C_'1'-l a7~ - ~ -c~ `t5o2 / AT S~~ ~ 0~ <br />In regards [o your inspection report for RCQ of 2002, there was a need to address the issues of <br />detention ponds within the quarry. <br />In response, I am submitting a new map that shows the current location of the ponds. Please note <br />that this is the same map that was used for our most recent amendment (dated 8/5/01) [hat states that these <br />ponds are subject to change as mining changes may dictate. The location of the cuttent ponds better control <br />the flow of storm water do to the change in mining. The ponds will continue to follow the direction of <br />mining. I think that you will see that the capacity of the ponds that are cuttently in place are far more <br />sufficient than what is needed for the required containment during the 2 year 24 hour event. <br />We have done some additional work [o insure [hat these ponds are working very well. In addition <br />we continue to back slope all of the benches and over blast benches so that storm water can penetrate the <br />surface area of the quarry. Please review the information that we have submitted and advise us if we need <br />to do anything further to address these issues. <br />Si/n~cerely, <br />V <br />Tom Smith <br />Director of Quarry Operations <br />Rocky Mountain Materials & Asphalt Inc. <br />473-3100 • Fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.