My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC15197
DRMS
>
Back File Migration
>
Inspection
>
INSPEC15197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:38 PM
Creation date
11/18/2007 9:09:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
DGMC
Inspection Date
7/16/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 41 <br />MINE ID # OR PROSPECTING ID # M-1986-076 <br />INSPECTION DATE 7/16/03 <br />INSPECTOR'S INITIALS RCO <br />The following problems IPBI and/or possible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />A new tailings pond has been begun, though it is not yet approved. 10/15/03 <br />PB or PV: PB <br />CORRECTIVE ACTION: The operator must gain approval for the new pond, according TOPICISI: MP <br />to the standards in Rule 7.3, by the date shown at right. _, _, <br />2. Recent activities have been carried out without salvaging topsoil, though it is 10/15/03 <br />required. PB or PV: PB <br />TOPICIS): TS <br />CORRECTIVE ACTION: The operator must commit in writing to the future salvaging _, _, <br />of all topsoil, which becomes available during the course of future mining activities. <br />The statement of commitment must specify that such salvage will be in amounts <br />adequate to reclaim, and that it will be followed by either prompt reuse on areas to <br />be reclaimed in the immediate future, or stockpiled and protected for later use. This <br />statement must be received at this office by the date shown at right. <br />None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPICISI: <br />4. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPICIS): <br />None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPICIS): <br />
The URL can be used to link to this page
Your browser does not support the video tag.