My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14983
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:26 PM
Creation date
11/18/2007 9:08:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Inspection
Doc Date
4/6/1983
Doc Name
BLUE RIBBON MINE MARCH 29 30 INSPECTION OUR FILE NO C-047-81
From
MLRD
To
BLUE RIBBON COAL CO
Inspection Date
3/29/1983
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br /> <br />V. Status of Problem Resolution <br />The following items concern problems identified at previous inspections. <br />Problems are classified into two categories. These are: (1) problems <br />resolved; and (2) operator delinquent. The date that the problem is <br />resolved or the date that the operator is deemed delinquent is to be <br />clearly stated. <br />PROBLEM RESOLVED <br />83-2. The access road warning sign has been installed. <br />83-3. The mine entrance sign was changed to reflect the current <br />MLRD permit number. <br />83-5. The portal bench was graded to ensure drainage would not <br />flow down the access road. <br />83-8. The ehd sections of the portal bench culvert were securely <br />connected. <br />83-9. The access road drainage ditch was maintained upon my <br />return inspection of 3/3U/83. <br />83-1U. The portal bench perimeter ditch was maintained upon my <br />return inspection of 3/30/38. <br />RESOLUTION IN PROGRESS <br />83-6. All current NPDES monitoring permits should be sent to the <br />Division quarterly. <br />83-7. The perimeter must be marked in accordance with Rule 4.OL.3 <br />by July 1, 1983. <br />83-1. Submit the engineer's certification letter to MLRD by A ril <br />30, 1983 - (deadline extended). An extension was granted due to staff <br />changes at the mine. The engineer who supervised the original <br />construction is no lonyer with the company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.