Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made dunng <br />the inspection. Comments also describe any enforcement actions taken dunng the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was an aerial inspection of the Carbon Junction Mine for the month of December, 2Q02. Weather <br />conditions were overcast and cold. <br />Roads: All main roads were in satisfactory condition. Culverts appear to be functioning as designed. <br />Hydrologic Balance: Both ponds were dry and appeared to be stable. <br />General Mine Comaliance: The mine is under the care of the Four Corners Gravel Pit for reclamation <br />and permitling work. Reclamation work still has not commenced since writing a violation in March. <br />Excess Spoil and Development Waste ,The pile remains as it has for several months. <br />