My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14972
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:16:26 PM
Creation date
11/18/2007 9:08:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Date
2/8/2005
Doc Name
Insp Rpt
From
DMG
To
Cripple Creek & Victor Gold
Inspection Date
1/20/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />oF~co~~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~~' - <br />„°' ~ MINERALS PROGRAM INSPECTION REPORT <br />~.~» PHONE: (303) 866-3567 <br />k ta76 ~ <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the <br />Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE <br />CORRECTIVE ACTION AND/OR RESPONSES TO THE DIVISION IN ORDER TO AVOID CONSIDERATION <br />OF POSSIBLE ENFORCEMENT ACTION BY THE MINED LAND RECLAMATION BOARD. <br />MINE NAME: CRESSON PROJECT OPERATOR: CRESSON PROJECT <br />COUNTY: TELLER MINERAL: <br />INSPECTOR(S): <br />MINE ID # OR PROSPECTING ID #: <br />TYPE OF OPERATION: 112D LEACH PAD <br />INSPECTION DATE: 1/20/05 DATE OF COMPLAINT: <br />INSPECTOR'S INITIALS: BK TIME OF DAY (MILITARY): <br />INSPECTION TYPE CODEtII: MI POST INSP. CONTACTStZt: <br />JOINT INSP. AGENCY CODEtZI: NO REASON FOR INSP. CODEt'I: <br />WEATHER CODEt°~: CL BOND CALCULATION TYPEtSi: <br />OP. REP. PRESENT: TIM COMER <br />NO <br />1. INSPECTION TYPE CODE -JCL-IN: IL=Illegal Operation, Mt=Monitoring, MP=Mineral ProspeM, SI=Surety-related, PR=PreoperatianJ <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - ICL-AG: NO=None, BL=BLM, CN=Colo. Dept. Health; CL=Land Board, <br />CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LC=Local Government, SE=State Engr.l <br />3. REASON FORINSPECTION CODE-JCL-RS:AC=Other Agency Request,CT=Citizen Complaint,tE=Normall&E Program,HP=High Priority,PY=Priority) <br />4. WEATHER CODE -JCL-WE: CL=Cloudy, CR=CIeay IN=Inclement -prevented Inspection, RN=Raining, SN=Snowing, WD=Windyi <br />5. BOND CALCULATION TYPE: - JBC=Complete Bond, BP=Partial Bond, NN=None) <br />This list identities the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB <br />OR PV IS INDICATED, YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE <br />COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV <br />is indicated, you will be notified under separate cover when the Mined Land reclamation Board will consider possible <br />enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... ~ (FN) FINANCIAL WARRANTY...... 1~L (RD) ROADS...................L <br />(HB) HYDROLOGIC BALANCE ............... (BG) BACKFILL & GRADING....... ~ (EX) EXPLOSIVES...........P_L <br />(PW) PROCESSING WASTE/TAILING...... ~ (SF) PROCESSING FACILITIES..... ~ (TS) TOPSOIL .................Y- <br />(MP) GENL MINE PLAN COMPLIANCE... ~ (FW) FISH & WILDLIFE ............... ~ (RV) REVEGETATION..... ~ <br />(SM) SIGNS AND MARKERS .................. Y (SP) STORM WATER MGT PLAN... Y (SB) COMPLETE INSP..... Y <br />(ES) OVERBURDEN/DEV. WASTE........... Y (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP...Y <br />(AT) ACID OR TOXIC MATERIALS......... Y (OD) OFF-SITE DAMAGE .............. Y (ST) STIPULATIONS........ NA <br />Y =Inspected and Found in Compliance PV = InspeMed aad Possible Violations Noted PB = InspeMed and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.