Laserfiche WebLink
303-279-832 <br />303-279-1609 Fay <br />eccosru•~a att.nct <br />,lone 1 t, 2007 <br />A4r. "1'inun Corner <br />Anglogoid Corp. <br />P.O. Box 191 <br />100 \urth Third Street <br />Victor, Colorado 80860 <br />Re: Demolition Cost Gstinu+te for (at~,iueering Building <br />Dear l~inun: <br />~~n-~a~o-ay.~ <br />Attached please find a cost estimate for demolition oC the i:n~~ineering Building at <br />CCc~ \%. The assumptions, inputs, cala+lution. and sununar} are sho~en on the atutchcd <br />spreadsheet. I used the latest (3007) Means I Leavy Construction Cost Data information <br />available in my calculation. The rangy of cosU for demolition is 527.879 (bare cusp to <br />$±6,36# (includes overhead and profit). If yvu use CCTV cquipntent io pcri~+r+n this <br />work. it might be slightly less due to the I;+ct you have no nu,hilizatiun to tite silt and <br />your equipment is lar~,er than standard demolition machinery. On the other hand. <br />contractors experienced in demolition typically have specialized equipment {i.e. shears <br />and wrecking balls) that are more suited to "demo" work. <br />If you have any questions. pieasr call me. (will be in nn' ofTice ~4'ednesda) through <br />Friday, .hate I _i-1 ~ and y\%cdnesday through Pridav..hute 20-'_3. <br />Sincucly. <br /> <br />Michael ll. 13llis, P.E. <br />Attachments: Engineer's Estimate (or 13anoiition ofCCKt%'s L-nginccrin~, Building <br />Ellis Environmental Engineering, Inc. <br />432 Ul~~sscs Wav <br />C:olden, Colurada ROd03 <br />