Laserfiche WebLink
Richard D. Lamm <br />Governor <br /> <br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getchea Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SNELTON, Dlroctor <br />COAL INSPECTION REPORT ~ <br />Operation: Red Canyon IIIIIIIIIIIIIIIIIII <br />File No.: C-034-81 <br />Operator Name: Grand Mesa Coal Company <br />Permittee Name: Same <br />Address: P,O. Box 226 <br />County: <br />Inspection Date: <br />Type of Operation: <br />Inspector: <br />Weather: <br />Time: <br />Type of Inspection <br />Operator Contact: <br />Delta <br />April 12, 1984 <br />Underground, federal <br />Dan Mathews <br />Clear and warm <br />8 a.m. - 12 noon <br />Complete <br />Larry Reschke <br />I. General Comments <br />The entire surface disturbance area including the Delta load-out facility was <br />inspected. <br />The Division's proposed decision on the Red Canyon Mines will be issued by the <br />end of April. Ironically, the operator submitted a notification of temporary <br />cessation of operations on April 13, 1984. The term of the cessation is <br />indefinite. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (30'x) 866-3567 <br />