Laserfiche WebLink
.~ <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Eastside Mine conducted by Erica Crosby of DMG. No <br />company representative was present during the inspection. The Eastside Mine is in reclamation <br />only status. The inspection involved viewing two aerial photographs taken by Harry Ranney of <br />DMG on January 27, 1998. Roughly 1 foot of snow cover was present on site. <br />Hydrologic Balance The sediment pond appeared to be dry, and only slightly under snow <br />cover. The ditch leading into the pond appears functional and the permanent drainage channel <br />appears to be in good repair. No erosion features were noted on the reclaimed slopes. . <br />Backfilling & Grading The backfilled and graded area were under snow cover but showed no <br />major signs of instability or erosion. <br />