Laserfiche WebLink
• <br /> <br />I _T _*. Corrren is - Comnli snce <br />•I <br />Below are particular issues o-d G'~ r=card to any of the abo~:e conc_'iance items. Enforcement <br />actions resulting from failure to comply o~ith the Act, Rules and Reculations, and the permit <br />also are identi.`ied below. <br />1. The identification marker and permit markers have been installed at the truck scale <br />araa. The waste material and coal stockpile has been removed a15o per our request. <br />2. Several problems were noted concerning the drainage from the site. The operator is <br />waiting to correct some of these problems until after the pending plan is approved <br />and a new permit is issued. !dined Land Reclamation Di visic•n decision on the Blue <br />Ribbon application is expected sometime in October. Illthosyh problems exist with <br />design parameters of the rnine drainage system, no violations of the performance <br />standards were noted. <br />3. Some rocks and gravel have washed or slid into the access toad drainage ditch (from <br />the mine bench down to the switchback this material needs to be removed. (See <br />problem section of this report). <br />