Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID #: M-1984-014 <br />INSPECTION DATE: 5/4/05 <br />INSPECTOR'S INITIALS GRM <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTION <br />DATE <br />1. Sedimentation and Stormwater control measures need to be installed. 6 / 14/ 05 <br />PB Or PV: ~~ <br />TOPIC(S): ~~ <br />Corrective Actions: A bar ditch must be placed along the permit boundary to direct run-off towards <br />the natural drainaggg. Silt fencing or a sedimentation pond m ~ t b on tr ~ t d at th pointwhere the <br />ditches enter the drainage. <br />2.I Topsoil is not being salvaged and protected. Waste rock piles and ramps made of waste are <br />photo documentation that all topsoil materials are being stripped down to rock or overburden <br />materials. The Division will mohitor this issue monthly. <br />J <br />3. Improper storage and handling of petroleum products is noted. <br />6 /14/05 <br />PB or PV: _P~ <br />TOPIC(S): S~ <br />6 / 14/05 <br />PB or PV: ~$ <br />TOPIC(S): ~I_ <br />