Laserfiche WebLink
,r <br />• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-83-030 <br />INSPECTION DATE 3/Z1/96 INSPECTOR'S INITIALS WHE <br />Thefollowing problems (PBI and/or possible violations (PV) (and suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The inspector noted <br />on the previous page should be notified of all corrective actions taken. <br />PROBLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Sediment containment structures were not observed for the tailings stockpile, DMG inspector discussed plans for sediment <br />control with the operator during this inspection, DMG shell review the plans for sediment containment structures as part of its <br />review process of TR-01. DMG will finalize its review of TR-01, following submittal of plans for the sediment containment ditch, <br />upland diversion ditch/berm, revegetetion plan for the tailings stockpile, and description of pond configuration. DMG decision <br />due date for TR-01 has been extended to 4116196. If the operator will require additional time to provide the plans discussed <br />during this inspection, [he operator may request extension to DMG decision due date. <br />CORRECTIVE ACTION: Submit plans for the sediment containment ditch, upland diversion ditchlberm, revegetetion plan for the <br />tailings stockpile, and description of pond configuration, as discussed during this inspection for inclusion into TR-01. <br />TR-01 Decision Due Date <br />PB or PV PB <br />TOPICIS) HB <br />PW, SF, _ <br />PB or PV _ <br />TOPIC(SI _ <br />1/ <br />PB or PV _ <br />TOPICISI <br />lend of report! <br />