Colowyo C-1981-019 <br />12 December 2006 <br />Pg 4/~ ~-~ <br />Hydrologic Balance (cont.): Streeter Pond (cont.) -The emergency spillway is an <br />open, trapezoidal riprapped channel. The spillway was stable and well maintained <br />at the time of the inspection. This pond was cleaned last month, with 300 cubic yards <br />of sediment removed. <br />-The Gulch A Pond (NPDES 004A) was not inspected. This pond was, however, <br />cleaned last month, with 400 cubic yards of sediment removed. <br />- Sump 2 contained water approximately two feet below the top and was not <br />discharging at the time of the inspection. The sump was stable at the time of the <br />inspection. <br />-Sump 3 contained water approximately four feet below the top and was not <br />discharging at the time of the inspection. The sump was stable at the time of the <br />inspection. <br />-Sump 4 contained water approximately two feet below the top and was not <br />discharging at the time of the inspection. The sump was stable at the time of the <br />inspection. <br />-Sump 5 contained water approximately one below the top and was not <br />discharging at the time of the inspection. The sump was stable at the time of the <br />inspection. <br />Backfilling and Grading: -The operator has completed more work on the East side of <br />the East Pit with the 101 dragline. The dragline has walked south to almost the final <br />East Pit cut and has almost finished its first cut in the wedge it is working on. Once it <br />completes this cut it will begin working its way back to the north. <br />Support Facilities: -The facilities area was wet and muddy but in good condition at <br />the time of the inspection. No problems were noted with the area. The operator has <br />removed much of the old equipment from behind the office and shop areas and has <br />regraded the area. They are in the process of upgrading the maintenance area in <br />the yard, including some lights and covered work areas. This area will be used to <br />park the equipment while it is being serviced and while it is waiting to be serviced. <br />- The Gossard Loadout was wet but appeared to be stable and in good condition at <br />the time of the inspection. The coal stockpile appeared to be lower than normal at <br />the time of the inspection. <br />General Mine Pian Compliance: -The operator was currently removing overburden <br />from the D-Seam in the West Pit with the 103 dragline. The 101 dragline is in the East <br />Pit performing reclamation. The 102 dragline was having its bucket replaced at the <br />time of the inspection. <br />-The 1 14 shovel operation was currently working on removing the X-Seam <br />overburden. <br />-The operator was dumping overburden in the mid-pit area of the West Pit.. <br />- The mining at the Colowyo Mine appears to be progressing as discussed and <br />approved in the PAP. <br />