Laserfiche WebLink
i • --- <br />Boadable equipeent: sheet 2 of 2 <br />"""""""" " Total Bqp. Fleet Sise Baul Trip Yetnra Trip <br />Nschiae Description Coet/ht (no. hauled) Coet/hr Coet/hr <br />Subtotals <br />MOB/DBNOB SUPPORT EpVIPMBMT: """ "' ""'""' <br />" """" "" " " " " " "' Yeight Ownership Baul Big Bleat Siee Baul Trip Neturn Trip DOT Pereit <br />Non-Yoads6le Nqp. Description (toss) Cost/hr Cost(hr (ao. hauled( Coet/hr Coatlht Cost(ea <br />Subtotals <br />Total Bqp, Bleat Siee Baul Trip Beturn Trip <br />Boadable Yqp. Description Coet/hr (no. hauled) Co et/hr Coat/hr <br />------------------------------------------------------------------------------------------------------- <br />Subtotals <br />BpUIPNBNT NAUL DISTANCE k TINB <br />------------------------------ <br />Nearest eajor city or town within project area region: Montrose <br />total ooe way travel distance ~ 9.0 sites, Average travel speed = A0.00 eph, <br />...... ............. <br />Job Tiee -Non Boadable Bquip.~ <br />I.00 hours load Boadable Equip.= <br />0.27 hours haul <br />1.00 hours unload <br />0.27 hours return <br />N/A hours load <br />0.27 hours haul <br />X/A hours unload <br />0.27 hours return <br />lOB COST <br />Total MoblDesob Cost = 51,301.92 <br />NOTE: Noo-roadeble equipeent (haul rig required to transport) sob/deeo6 costa based on 2 rowed trips, each trip <br />consistin6 of a one-way loaded haul and a ooe-way eepty return. Boedahle equipeent (no haul rig required) <br />coats based on one round trip. Colorado DOT requires special pereite for overeise equipeeat on certain <br />specified road segeents within the State. Separate pereits are required for each rig on each loaded trip, <br />Additionally, pilot care (one or two per rig depending on degree of overeise) are also required Eor oversice <br />equipeeat hauling, and loading/unloading rises coat be increased eubstantislly for equipeeat which cost be <br />partially diseaotled for transport sad re-aseeebled at the job Bite. Coats for lifting equipeent and other <br />support equipeent needed for this work should 6e included in the sob/deeob costa. <br />