Laserfiche WebLink
<br />80UBL4 PRODUCTION coat'd Sheet 2 of 2 <br />................. <br />Loader Cycle Tiae cont'd <br />................. <br />Bolling 6esietance <br />.................. <br />Boaduay underfootiag cosditione: <br />Baul :Butted dirt, little/ao ~aiat.,l-2' fire pea. <br />Beturn:Butted dirt, <br />............. little/no <br />.......... ~aint.,l-2' fire peo. <br />..................... <br />....... <br /> Crade Bolling Total Travel <br /> Length Besiet. Besiet. Besiet. Ties <br />Saul 1 return Tire: <br />-------------------- (ft( <br />----- (i( (S( (S( (sin.( <br /> <br />Baul Bauee: ----- <br />300 --------------------- <br />1.00 5.00 ---------- <br />6.00 --------- <br />0.323 - <br />(C8B jar( <br />Return Route: <br />. 300 <br />......... -1.00 5.00 <br />..................... 1.00 <br />....... 0.255 (C8B ury( <br /> Total travel tine = 0.578 <br /> Total cycle tine = 1.087 aiautea <br />Loader Bucket Capacity <br />...................... <br />Bated Capacity= 1.50 LC4 (heaped( <br />Bucket fill factor. 0.945 Loose gat.-joist sired aggregatee(9S -IOOS( <br />Adjusted capacity= 4.39 LC4 <br />Job Coaditioo Correction Factors <br />................................ <br />Site altitude = 6,000 ft. <br />Altitude correctioo [actor = I.00 (C8B cdh( <br />Job efficiency factor . 0.83 (Ish/day( <br />Net Correction = 0.83 Multiplier <br />Uoadjueted Sourly Uoit Productiou 213.13 LC4/8r <br />Adjusted 8ourlp Unit Production 201.80 LC4/Ar <br />Adjusted Sourly Fleet Production 201.80 LC4/8r <br />JOB COST <br />Fleet sine = 1 Loader(s~ <br />Unit coat = (0.763 /LC4 <br />Total job ties = 121.59 Bourn <br />Total job coat = 18,901.30 <br />