Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: nn_ioo~-m~ <br />INSPECTION DATE: narn~m~ INSPECTORS INITIALS: ~fA2 <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. During the inspection, it was discovered that The sign posted at the mine entrance 06/ 23/ 03 <br />identifies another of the operator's mine sites. This is a problem related to 3.1.12 (1)of the <br />Constructions Materials Rules and Regulations, <br />PB or PV: ~B_ <br />TOPIC(S): ~~ <br />Cnrractiva Actinn~ Post tha a~,nrn rip ntP. Slgn nt tha antrnnra of tha mina site within 3n dnvs - _ <br />rpCpjpt of thig inq~yantinn rpp(L nnrl gpnri nhntnc to nMC for varifirntinn <br />2. During the inspection, it was discovered that there was no stockpile of topsoil at the site, 07 /23 /03 <br />which would be used for reclamation of the site. This is a possible violation of 3.1.9 (1) of <br />the Construction Materials Rules and Regulations, for failure to remove and seareaate <br />topsoil from other spoil and/or a possible violation of the 34-32.5116 of the <br />Colorado Revised Statutes. commonly referred to as the Colorado Land Reclamation Act <br />for the Extraction of Construction Materials for failure to pertorm the reclamation plan <br />prescribed reclamation plan. <br />PB or PV: ~B_ <br />TOPIC(S): ~.S_ <br />Corrective Action Within 60 days of receipt of this report. submit proof to the Division that <br />there is adequate topsoil at the site to reclaim the site according to the aq rg owed <br />reclamation plan, or revise the reclamation plan to include importation of adequate topsoil <br />to the site for reclamation. In the case where topsoil would be imported to the site, the <br />Division will racaln data tha hand for tha sites to inch ides tha cost of topsoil imaortation. and <br />tha aaamtar will ha raauirad to si ihmit tha additional bond <br />