Laserfiche WebLink
e <br />INSPECTION REPORT - PAGE 2 <br />FILE N0. M-81-148 <br />DATE: September 11, 1985 <br />OBSERVATIONS OF IMPORTANCE: <br />1. Site was inspected even though Mr. Leidich was unable to attend. <br />2. Site is as described in annual report with activities in Stages 1, 3, 7 <br />and 2. <br />3. Topsoil has been stockpiled in Stage 7. <br />4. Disturbance in Stage 3 primarily entail dozer width cuts to a depth of <br />about 10 ft in 3 areas. Also, couple of areas have been cleared of vegetation <br />and probably topsoil as well. <br />5. Clay stockpiled in stage 2 and in Stage 3. <br />6. Area still heavily utilized by motorcyclists. <br />1. Slides 1-3 Stage 1 area from south side. <br />4-6 Stage 3 area from north side. <br />RECOMMENDATIONS: <br />1. Topsoil pile should be seeded this fall as specified in permit. <br />2. Permit specified mining was to cease in Stage 1 in May, 1985 with <br />reclamation to occur by May, 1986 due to lease requirements. Has this ; <br />timetable changed or will reclamation be completed on schedule? <br />/yt <br />Doc. No. 3477 <br />