Laserfiche WebLink
..- F"_ <br /> <br />(Page 4) <br />MINE ID # OR PROSPECTING ID $ M-77-493 <br />INSPECTION DATE 9-28-93 INSPECTOR'S INITIALS ACS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. .The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Permit has not been revised to include the type of 11 / 15 / 93 <br />reclamation on-ooinq at the Moly-Oxide Pond. <br />PB or PV PB <br />Submit TR as described in operations section of this report. TOPIC(S) RS <br />2. Sludoe from Mount Emmons facility disposed of at Climax 11 / 15 / 93 <br />ponds. No TR submitted. <br />PB or PV PB <br />Submit TR detailino operational and reclamation aspects <br />Mt. Emmons Sludoe disposal. TOPIC(S) PW <br />