My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14035
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:15:31 PM
Creation date
11/18/2007 9:03:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Inspection
Doc Date
3/24/2004
Doc Name
Description of Findings and State Engineers Rpt Regarding the Robinson Lake Outlet Works.
From
Climax Molybdenum Company
To
DMG
Inspection Date
9/8/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAM NAME: ROBINSON <br />Page 2 DAM I.D.: 370107 DATE. 7/772003 <br /> EXI6TING INSTRUMENTATION FOUND '~ p10)NONE ~J(11 tj GAGE ROD LJp12)PIEZOMETERS U(113)SEEPAGE WEIRS /FLUMES Xs <br /> L,'j114)SURVEY MONUMENTS ^ (715)OTHER <br /> <br />• <br />MONITORING OF INSTRUMENTATION ^ (116)NO C(117)YES PERIODIC INSPECTION$BV: E%j(116)pWNER ~(119)ENGINEER 4 <br />D ~ P <br />e O <br /> O r O <br /> Monuments need to be resurveyed and report submitted to our office. n ; R <br />• • <br /> PROBLEMS NOTED: ^(60 NONE ^ (61)ACCESS ROAD NEEDS MAINTENANCE ^ (62)CATTLE DAMAGE X <br />• ^(63)BRUSH ON UPSTREAM SLOPE. CREST, DOWNSTREAM SLOPE, TOE ^(W)TREES ON UPSTREAM SLOPE. CREST, DOWNSTREAM SLOPE. TOE <br />c <br />~ P <br /> ~/ (66) RODENT ACTNITY ON UPSTREAM SLOPE, CREST, DOWNSTREAM SLOPE <br />^ 77PS~ ^(66)DETERIORATED CONCRETE- FACING. OUTLET SPILLWAY O <br />o a 0 <br />e o <br /> <br />^(67)GATE AND OPERATING MECHANISM NEED MAINTENANCE ^(68)OTHER 0 i R <br />• <br />Usual rodent activity in area at the toe of the downstream slope between the spillway and maximum , <br />e <br />' section of dam. See page 3. <br /> Dam is in satisfactory condition, but unknown condition of old outlet. with its intake buried in silt, has been <br /> <br />;' neglected for many years warrants conditionally satisfactory rating. Also condition of siphon is unknown. <br />:. <br />• • Based on Dlis Safety Inspection and recent file review, the overell corWition is detemlined ro be: <br /> ^(71)SATISFACTORY O(72)CONOInONALIY SATISFACTORY ~ ^(73)UNSATISFACTORV <br /> ITEMS REQUIRING ACTION BY OWNER <br /> TO IMPROVE THE SAFETY OF THE DAM <br />O `p w <br />q <br />o IWNTENANCE-NNOR REPAIR•MONff01UNG <br />• <br />C G aYt ^(80) PROVIDE ADDITIONAL RIPRAP; <br />~ o = `O (B1) LUBRICATE AND OPERATE OUTLET GATES THROUGH FULL CYCLE <br />o •' `r a Ei (62) CLEAR TREES AND/OR BRUSH FROM: ' <br />O w O • W <br />g + 63) INRIATE RODENT CONTROL PROGRAM AND PROPERLY BACNFILL EXISTING HOLES: <br />^`r( downstre <br />m <br />slo <br />e <br />&to <br />ov = <br />C u ~ u E _ <br />p <br />_ <br />e._... <br />a <br />IJ (BQ GRADE CREST TO A UNIFORM ELEVATION WRH DRAINAGE TO THE UPSTREAM SLOPE: <br /> <br />c • ~ r .. <br />D a • r ~ <br />' Add TOI.2_fOBQ t12Se t0 l112ke It eaBlef [O maipla <br /> <br />^ ln_ _ _ _ _ _, _ _ <br />= O • a <br />API •w c (e6) PROVIDE SURFACE DRAINAGE fOR: <br />c _a r, _...__........_............_._......_._....__ .............._............_....._.._.............._..._................_.. <br />~(B7)OEVELOP AND SUBMIT AN EMERGENCY PREPAREDNESS PLAN: ........... <br />y~_'~9 <br />o . 2 0 UpAat@J7~ar185 CI13I1gB5000Ur______ __________ ____________________ <br />~(6s) orHER ___________ <br /> <br />•^oN n? <br />E ~ ~ O ~ remove oldpipeline from dam crest near the spfNway to make crest regrading easfer,_,_ <br />^ <br />~ <br />89 <br />OTHER <br /> <br />$ ~ E a ( <br />) <br />Uncover outlet Intake <br />qy ~ ~ ENGINEEWNG-EMROY AN ENGINEER EXPERIENCFDNDESIGN ANO CONS7RUC110X OF DAMS iO: (%a¢ad$pecificationa must ee approved by Stale Elpineer pdarMansVOCSOn.) <br />Y ^(90) PREPARE PLANS AND SPECIFICATIONS FOR REHABILITATION OF THE DAM: <br />o <br />e ^(97j PREPARE AS $UILT DRAWINGS OF: <br />' <br />li a <br />u~ e H E .___...... _._........._..-_ <br />^(92) PERFORM AGEOTECHNICAL INVESTIGATION TO EVALUATE THE STABILITY OF THE DAM: <br />__. .... ___. <br /> <br />.. <br />, <br />a <br />a4 ~ ~ ........_..__ <br />.__......._... _.......... _._.._... <br />^(93) PERFORMAMYDROLOGIC STUDY TO DETERMINE REQUIRED SPILLWAY SIZE: .__ <br />.... <br />~ <br />c c O (~) PREPARE PIAN$ AND SPECIFICATIONS FOR AN ADEQUATE SPILLWAY: <br />Y <br />+ <br />c ii .", 3 3 <br />(96) SET UPAMONITORING SYSTEM INCLUDING WORKSHEETS, REDUCED DATA AND GRAPHED RESULTS: <br />. ~(%)PERFORM AN INTERNAL INSPECTION OF THE OUTLET: <br />9 ~ <br />CrU BOtll Old_pIpB S_SlpllOfl_J(2eJl US apli_58d Of lnspCttf_On B•SUbrlllt repOR,_. .____,._.,, <br />m = u `" _ ^(97) o7NER: For outlet inspection, epnstruet cofferdam as.planned under dire_cbo_n of_ e_ngineer _ __ __ <br />_ _ __ <br />.. <br />... <br />........ <br />L N • L Y <br />~ +C s o _ <br />.. <br />~ <br />^ <br />9e <br />THER <br /> ( <br />) O <br />: The su_bmittal_of plans and_specs for ltem.i97i are not required----------------------------------------------------------- ------------ <br /> ^1991 OTHER: <br />SAFE STORAGE LEVEL RECOMMENDED AS A RESULT OF THIS INSPECTION <br />^(101) FULL STORAGE FT. BELOW DAM CREST <br />`j(102) CONDITIONAL FULL STORAGE <br />FT. BELOW SPILLWAY CREST <br />~ _ <br />^(103) RECOMMENDED RESTRICTION FT. GAGE HEIGHT <br />~~~ ~ NO STORAGEJ•IAINTAIN OUTLET FULLY OPEN <br />^ (101) CONTW UE EXISTING RESTRICTION <br />REASON FOR RESTRICTION <br />ACTIONS REQUIRED FOR CONDITIONAL FULL STORAGE <br />terns 97 and 96 <br />/ <br />< <br />~(~(/ Dwnara <br />• <br />Engineers ~~ - <br />&9naMe ~ _ _Signatve DATE: <br />' <br />S REPRESENTATNE _ <br />__ INSPECTED BY _ _ _ OWNER/OWNER 2A _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.