My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC13924
DRMS
>
Back File Migration
>
Inspection
>
INSPEC13924
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:15:25 PM
Creation date
11/18/2007 9:03:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988042
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Lafarge West Inc.
Inspection Date
12/10/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 12/23/2002 <br />User : TAS <br />State :Colorado <br />County :Weld <br />Site :Cottonwood Pit <br />PermiUjob # : M-1988-042 <br />Abbreviation :none <br />Filename : M042-003 <br />Agency or organization name :Division Of Minerals & Geology <br />Permit or other job action : Fina! Reclamation <br />Task description :Rip 54 acre plant site to relieve com <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cah <br />Attachment no. 2 :3-shank riooe <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic <br />Area <br />Horsepower: 305 <br />Shift basis : i per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $48.72 NA <br />Dozer operating cosf/hour : $61.57 100 <br />Ripper operating cosVhour : $757 100 <br />Operatorcost/hour : $30.65 NA <br />Total unit cosVhour : $148.50 Total fleet cosf/hour : $297.00 <br /> <br />NA NA <br />54.00 acres <br />Load factor : NA Bank volume : NA BCY <br />Rip depth (ft) : i.50 Volume : 130,680 BCY or CCY <br />Source of estimated quantity :per <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 0.75 feeUpass <br />Average ripping width : 708 feeUpass <br />Average ripping length : 300.00 feetpass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.800 acres/hour <br />Unadjusted production : 96745 cu. yds./hour <br />JOB 71ME AND COST <br />Fleet size : 2 dozers) <br />Unit cost : $0.185 per cu. yd. <br />Unadjusted production <br />per selected method : 96745 cu. yds./hour <br />Site altitude : 6,000 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production <br />Adjusted fleet production <br />802.99 <br />1,605.97 <br />cu. yds./hour <br />cu. yds./hour <br />To[al job time : 81.37 hours <br />Total job cost : $24,167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.