Laserfiche WebLink
(Page 3) <br />MINfi ID # OR PROSPECTING ID # M-80-244 <br />INSPECTION DATE 2/3/95 INSPECTOR'S INITIALS JAP <br />Mr. Hardaway and I next toured the Processing Building. John reported that the processing <br />plant was scheduled to be started up imminently. Operation of the processing plant will <br />allow recovery of resource from the pregnant solution collected from the ore pocket in the <br />toe dam sump of Phase 1 of the Heap Leach Pad. <br />Finally, Mr. Hardaway and I toured the crusher <br />pile to date has been gleaned from small pits <br />the Cresson pit area. John reports that CC&VG <br />& Antiquities release for the majority of the <br />rapidly becoming ore bound. Without release o <br />mining may be halted within ten days. <br />I 6 S Contact Address <br />area and the mine pit. Ore placed in the <br />scattered about the western valley wall of <br />have yet to receive the final BLM Cultural <br />Cresson pit. As a result the project is <br />f the necessary area, John anticipated that <br />NAME John Hardawav <br />OPERATOR Cripple Creek & Victor Gold Co. <br />STREET P.O. Box 191 <br />CITY/STATE/ZIP Victor, CO 80860 <br />cc: Berhan Keffelew, DMG <br />Al Sorenson, DMG <br />Jim Dillie, DMG <br />Carl Mount, DMG <br />Bruce Humphries, DMG <br />^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />