Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the New Horizon Mine for the 3rd quarter, 2001. The purpose of this <br />inspection is to conduct normal operations and environmental compliance and a joint SAE and explosives <br />record check special focus inspection. The weather was clear and warm. <br />AVAILABILITY OF RECORDS: Records were inspected and found to be in compliance. See page 5 <br />of this report for further details. <br />ROADS: Haul roads and the BB road detour was inspected and no problems were noted. The <br />reconstruction of BB road is underway and is close to final grade. Again, no problems were noted. <br />HYDROLOGIC BALANCE: Mine 2: Ponds 7 and 8 had water in them and 8 was discharging but no <br />sample was taken. Pond 9 was inspected and found to be extremely well constructed. One noted concern <br />was at the inlet culvert which could use some flow fill to insure water did not erode underneath the'/: pipe <br />channel (see photo). All ditches and culverts were clear and capable of functioning as designed. <br />BACKFILL 8 GRADING: B & G was in progress as is normal. No problems were noted. The land <br />continues to be reclaimed to the approved post mining topography map and no low spots were noted. <br />EXPLOSIVES: Records were inspected and found to be in compliance. All blasting procedures are being <br />followed and seismograph's readings are available for all but parting shot blasts. Publication of the <br />blasting schedule and a request for any party interested in a pre-blast survey were complete and timely. <br />A check on 3 seismographs for yearly certification was conducted and all instruments were in compliance. <br />GENERAL MINE COMPLIANCE: The mine continues to progress in an orderly and well run fashion. <br />RECLAMATION SUCCESS: A Phase I bond release has been received by the Division and <br />will be inspected later this summer. <br />