Laserfiche WebLink
ORIGINAL - POBUC FILE <br />Page 2) <br />MINE ID # OR PROSPECTING ID #: ti+-~ 9s;n-~aa <br />INSPECTION DATE: 3/~Od INSPECTOROS INITIALS: ~- <br />OBSERVATIONS <br />The Division conducted a monitoring inspection of the site on 3/18/04. <br />Present during the inspection were Tim Comer of CC&V. Inspected the Main <br />and East Cresson pit areas. East Cresson was active at the time of the <br />inspection, no major problem noted. Inspected the Iron Clad Globe hill <br />areas, no problem noted. Inspected the shop and explosive storage areas, no <br />major problem noted. <br />Inspected the Portland Pit area, it was being backfilled at the time of the <br />inspection. No major problem noted. <br />Inspected the Phase I, II, III AND IV pregnant solution collection areas <br />and recorded the following readings from the High and Low volume solution <br />collection systems. <br />Phase I, High Volume Solution Collection system transducer # 1 was recorded <br />at 48.5 # 2 was at 44.7 and # 3 was at 44.1 Piezometer for the pond was at <br />43.7 feet. <br />Phase II, High Volume Solution Collection system transducer # 4 was <br />recorded at 38.6, # 5 was recorded at 38.3 and #6 was at 40.0. <br />Piezometer was at 39.9.Low Volume solution collection transducer # 1 was at <br />.14 and # 2 was at .28 <br />Phase IV, High Volume Solution Collection Transducer # 7 was recorded at <br />16.9, # 8 was at 16.3, # 9 was at 16.4 and # 10 was at 16.8. Low volume <br />collection transducer # 1 was recorded at 17.5 and # 2 was at 6.9 inches of <br />hydrostatic head. ALL OTHER TRANSDUCER REDINGS ARE IN FEET OF HYDROSTIC <br />HEAD. <br />I & E Contact Address r OTHER <br />NAME: PHIL BARNES <br />OPERATOR: CC&V <br />STREET: P r7BnX 191 <br />CITY/STATE/ZIP: vlcma ~~ RnRbn <br />CC: <br />Harry Posey ~e-mail) <br />cc: r CE <br />r BL <br />T FS <br />r HW <br />r HMWMD (CH) <br />r <br />r sE <br />r WOOD (CH) <br />