Laserfiche WebLink
ORIGINAL -PUBLIC FILE <br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: A~480-add <br />INSPECTION DATE: ~/77/1l7 INSPEC70ROS INITIALS: ~- <br />OBSERVATIONS <br />The Division conducted a bi-monthly inspection of the site on ~d'$~p~ The main purpose of <br />the inspection was to collect a split sample from POND 4A, prior to CC&C submitting a pad <br />decommissioning request for pads the old Iron Clad/Globe Hill pads. Present during the <br />sample collection was Lawrence Meyers of CC&V. <br />A Split sample for Metals sulfate and wad cyanide were collected. Samples delivered to <br />CDOK&E lab the next day. ALL SAMPLES W$RE KBPT IN A COOLER WITH ICE PRIOR TO DBLIVBRING TO <br />CDOH6S LAB. <br />After the sample collection, with Mark Vanoni OF CC&v, present, the valley Leach facility <br />was inspected. Along the access road to Phase IV low volume solution collection a <br />discussion was held about having that area re-surveyed again to make sure it is not a low <br />area that could cause some future erosion problems along the anchor trench. Mark said he <br />will request the area to be surveyed once he gets a chance to look at the as built <br />drawings. <br />Inspected the Phase i, II, II&IV Leach pad areas and collected the following readings from <br />the High and Low Volume Solution Collection Transducers. <br />Phase I High Volume Solution Collection Transducer #1 was recorded at 7.0 (read out meter <br />still not functioning) #2 was at 39.2 and # 3 was at 39.4. Piezometer for the pond was at <br />43.5 feet. Low Volume solution collection transducer #1 was recorded at .23 and # 2 was at <br />0.58. <br />Phase IZ &IiZ High Volume solution Collection transducer # 4 was recorded at 14.2 # 5 <br />was aC 13.6 and # 6 was at 14.5. Piezometer for the pond was at 29.1 feet. Low volume <br />transducer # 1 was at.03 and #2 was at.63. Piezometer for the pond was at 28.7 feet <br />Phase ZV High Volume Solution Collection Transducer # 7 was recorded at 14.0, #8 was at <br />15.0, #9 was at 15.5 and # 10 was at 19.9. Low Volume Cransducer # 1 was at 11.3 and # 2 <br />was at 8.3 inches of hydrostatic head. <br />Inspected the External pond, it was holding a small amount of what appeared to be <br />partially frozen water .Low volume Solution Collection transducer # 1 for the pond was <br />recorded at 11.7 and # 2 was at 12.9 inches of hydro static head. <br />Inspected the under drain area, both the south and 4 inch pipes were discharging ak lower <br />cfs than was observed during the last inspection. The north under drain and solid 24 inch <br />pipes were dry. All lower ponds were holding about the same amount of what appeared to be <br />frozen water covered with snow as was noted during last inspection. <br />Notes All transducer readings are in feet of hydrostatic head unless othezwiae noted. <br />I & E Contact Address <br />NAME: TIM COMER <br />OPERATOR: CCaV <br />STREET: P n Box t9i <br />CITY/STATE/ZIP: ylcrna cni naann snaRn <br />cc: r CE <br />r BL <br />r FS <br />r Hw <br />r HMWMD (CH) <br />r <br />r SE <br />