My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC13406
DRMS
>
Back File Migration
>
Inspection
>
INSPEC13406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:14:58 PM
Creation date
11/18/2007 9:00:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Name
COAL INSPECTION REPORT
Inspection Date
7/23/1992
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Comments -Compliance <br />Below are comments on the inspection, The comments include discussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action. <br />Un Jule 23, 1992 The Division conducted a partial inspection at the Somerset <br />Aline. Handy Price and Erica Crosby conducted the inspection. The primary <br />purpose of the inspection was to inventory structures for bond liability <br />calculations. The inspectors met with Basil Bear of the mine but he did not <br />accompany the inspectors during the inspection. •Che weather during the <br />inspection was clear and warm. <br />The inspectors Lon red Lhr sn rl'are frrcrlil ie~ :~ren •md t.ool. plinto~r;~phs u. <br />s1 rnr tares. Aline trorl,ers wrre ~ IcaninK ditches unl m:+n~ dit~•her slrrn,r rl <br />evidrnre of r•errnt mainten:mrr I~•orl.. Uitrho~; :dune; the htnil road wore receutl~ <br />cleaned. <br />'f he sedinmut control system in the E11< Creek eyuipmeut storage area was in suou <br />condition. The Elk Creek culvert aas clear. <br />The Inspectors walked the corneyor corridor. The inspection continued to Lhc <br />coal waste disposal area, topsoil stot•age area and then down to the sediment <br />pond on the conveyor bench. Water from the Sanborn Creek water treatment pond <br />was being pumped to this sediment pond. This pond is being used to suppleme,It <br />the treatment pond, hrater is not allowed to rise above the sediment clean out <br />level of the sediment pond; this is to maintain the capacity of the pond to treat <br />a 10 year, 24 hour precipitation event. The water pumped to this pond was fairly <br />clear. Sanborn Creek did not s:~ow any evidence of flowing Lhis year. <br />'Che portal area was well maintained. The ditch thai serves as an uppet• area <br />diversion for the portal area on Lhe east side showed evidence of sediment <br />accumulation but had recently been cleaned out and enlarged to form a sedimea~ <br />sump. The slope above this ditch appeared to be the major contributot• of the <br />sediment; this will be seeded this fall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.