Laserfiche WebLink
-~ j i <br />~.Y <br />-lti- September 23, 19f13 <br />U-3 <br />Ked i~ 1 ays <br />1. Check for drainaye and sediment control at the upper Huubard Creek <br />Vent pad and adjacent topsoil pile. The lower Verrt Fan should not drain <br />over the outslope into Hubbard Creek. <br />1. Check for coal spillage over the bank into Elk Creek at the <br />"employee load-out" behind the shed. <br />Inspection Goal: 4 complete, 2 partial = b inspections <br />Could miss once per yuarter especially in winter. They are on a limited <br />production schedule, propose no new disturbance, and are usiny facilities <br />that are kil years old. Hut inucii can go r~rony at the mine that already <br />has not. Revegetation will not be a major concern until mine closure. <br />Hiyh Altitude Structures - (Upper Huuuard Creek 'Dent site, degas wells) <br />should be checked suimuer and early fall. <br />liydroloyy - Uuriny spriny runoff. <br /> <br />