Laserfiche WebLink
"Waste Piles: Do engineering designs exist along with pictures of the construction <br />of the underdrain? Where? /~ <br />n Y1- TvrJP v ~h)mn..i /I ,raw ~ n r,nAir ~ ~ DP (~n~ _ lni.t l ~d°/~/) l 1. <br />JUG ~ ~YILI,e.Q~pIYLQ~- V~'Gle iS ctyt.nG(X.U~FQ - I.UVl~}- ?.L.Cr c5 d~Q.U~ (lJ]!, <br />"Are quarterly PE inspection reports and proctor density test results available for S ~~ <br />inspection? Where? ~fJ'1 t1tQ !Nl <br />NO <br />(iv) The degree to which erosion and sediment control is present and functioning; <br />Do all disturbed areas drain to permanent ponds or impoundments? If not, describe <br />those areas that do not. Is a sediment pond necessary? <br />Describe any mechanical treatments to the reclaimed surface (furrowing, terracing, <br />imprinting, pitting, ripping, etc.) - <br />wl9e o na~ft~l ~ ~ n fix~.~t~ l U 5~d , l1PU~ . nn e n ~h/Yi J~ <br />Describe any areas of sediment deposition in ditches, livestock tanks, or ponds <br />5 <br />Describe any areas of rills and gullies noting depths, lengths, frequency and estimates <br />Describe whether rainfall or snowmelt (or both) aze the primary cause of erosion or <br />