Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />The seismograph report attached to the July 24, 2001 blasting record indicates that the peak <br />paz[icle velocity is in compliance with the limitations of Rule 4.08.4(10). However, the event <br />date for this seismographic report is January 17, 2000. Please clazify this discrepancy and submit <br />to the Division a copy of the seismograph report that corresponds to the blast conducted on July <br />24, 2001. <br />