Laserfiche WebLink
' III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Carbon Junction Mine for the month of October, 1 996. <br />The site is dry. The sediment ponds are dry as well. The operator has recently recut the ditch <br />leading down to pond 2 from the south and reconstructed the rock check dams. The <br />reconstruction was well done and should function well. <br />Material is being piled up for construction of the structure to divert a 100 year event from the <br />excess overburden fill. <br />