Laserfiche WebLink
CIRCES Cost Esti mating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 001 State : Cdwadu PormiUlob# M-1999-047 <br />Date : 02107/2006 County :Yuma Abbreviation :norm <br />User SAS Site :Adamson Brothers Pd Filename :M047-001 <br />Agency or organization name : Division 0I Minarnls B Geolog y <br />Penult or other job action : Final RecJamabon <br />Task descrption Re-spread 12,000 cy salvaged topsoil <br />HOURLY EQUIPMENT COST <br /> easrc machine :Cal 08H Senes U - 8SU Horropower : 3f0 <br /> Blade typo : Sor nl-Umvorsal <br /> Attachment no. I : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Seat Breakdown : Ownership cosUhour : 542.78 NA <br /> Operating cosUTour : 566.09 i00 <br /> Ripper op. cosUhour : 50.00 NA <br /> Operator cosUhaur 531.78 NA <br /> Total unit cosUhour - $140.66 Total tloet cosUhour ~. 5140.66 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume r2.000 LCY factor : NA volume : 12,000 I.CY <br />Source of estimated volume :permit <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition rr ion Factor a Source <br /> Oporatorskill: 0.75 (avg.) <br />Average push distance 150 loot Material consistency : 1.00 (Car H8) <br />Unadjusted hourly production : 634.3 LCYlhr Dozing method : 1 20 (slot) <br /> Visrblldy . 1.00 (avg.) <br />Matenal consistency descdpbon : Job elfidency : 0.83 ! ishclUday) <br />CarsoOdared stockpile Spoil pile : 0.80 (Intl-r/J <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1 00 (Cnf HB) <br />Average sdo altitude : 5.000 feel Material weight : f 44 (Cut HB) <br /> Blade type : __ 1.00 _ _ (S/SU/U) _ <br />Matenal weight : 1,600 IbsiLCY Not oorroctlon : 0 90 <br />Walght description <br />Top Soil Adjusted unit production 5c.<.~ 9 r LCYlhr <br /> Adjusted Beet production 569.91 LCYlhr <br /> <br /> <br />J08 TIME AND COST <br />Fleet size : i Dozer(s) Total job lime . 21.06 Hours <br />Unit cost : 50.247 1LCY Total job cost : 52,962 <br /> <br />