Laserfiche WebLink
DEN1lER ®FFICE <br />I'UELIC FILE C <br />O~ COLORADO DIVISION OF MINERALS AND GEOLOGYFIIe; OP1/ <br />Hr~~ - / ~~ig -o / <br />MINERALS PROGRAM INSPECTION REPORT Site: ~l..noeti yai ~`_~/ <br />"Y,a,6 ~; PHONE: (303) 866 3567 Action'-' u-~,v // <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This <br />report documents observations concerning compliance of the mining operation with the permit and the regulations <br />of the Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and <br />suggested corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the <br />Mined Land Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY <br />REQUIRE CORRECTIVE ACTION AND/OR RESPONSES TO THE DIVISION IN ORDER TO AVOID <br />CONSIDERATION OF POSSIBLE ENFORCEMENT ACTION BY THE MINED LAND RECLAMATION BOA/RD. <br />MINE NAME: Hidden Vallev Pit OPERATOR: B&B Excavating <br />COUNTY: Eagle MINERAL: Sand and Gravel TYPE OF OPERATION: 112 (c) <br />INSPECTOR(S): Russ Means <br />MINE ID # OR PROSPECTING ID #: M-1998-024 <br />INSPECTION DATE: 6/19/02 DATE OF COMPLAINT: N/A <br />INSPECTOR'S INITIALS: GRM TIME OF DAY (MILITARY): 0900 <br />INSPECTION TYPE CODEItI: MI POST INSP. CONTACTSt~1: NO <br />JOINT INSP. AGENCY CODEIZI: NO REASON FOR INSP. CODEI31: IE <br />WEATHER CODEI4I: GR BOND CALCULATION TYPEIs1: NN <br />OP. REP. PRESENT: Jason Burkev <br />1. INSPECTION TYPE CODE - [CL-IN: IL=Illegal Operation, MI=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Pre-operation] <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - [CL-AG: NO=None, BL=BLM, CH=Colo. Dept. Health; CL=Land <br />Board, CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LG=Local Government, SE=State Engr.] <br />3. REASON FOR INSPECTION CODE - [CL-RS: AG=Other Agency Request, CT=Ctizen Complaint, IE=Normal I&E Program, HP=High Priority, <br />PY=Priority] <br />4. WEATHER CODE - [CL-WE: CL=Cloudy, CR=Clear, IN=Inclement -prevented inspection, RN=Raining, SN=Snowing, WD=Windy] <br />5. BOND CALCULATION TYPE: - [BC=Complete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. <br />REGULATIONS. If PV is indicated, you will be notified under separate cover when the Mined Land reclamation <br />Board will consider possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... ~ (FN) FINANCIAL WARRANTY...... N_ (RD) ROADS................... ~ <br />(HB) HYDROLOGIC BALANCE ............... ~L (BG) BACKFILL & GRADING....... ~ (EX) EXPLOSIVES........... GL_. <br />(PW) PROCESSING WASTE/TAILING...... ~L (SF) PROCESSING FACILITIES..... ~ (TS) TOPSOIL ................. P8/ <br />(MP) GENL MINE PLAN COMPLIANCE... `L (FW) FISH & WILDLIFE............... ~ (RV) REVEGETATION..... 'P~. <br />(SM) SIGNS AND MARKERS .................. Y (SP) STORM WATER MGT PLAN... Y (SB) COMPLETE INSP..... Y <br />(ES) OVERBURDEN/DEV. WASTE........... ~lA (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP... IV <br />(AT) ACID OR TOXIC MATERIALS......... ~lA (OD) OFF-SITE DAMAGE .............. Y (ST) STIPULATIONS........ NA <br />Y =Inspected and Found in Compliance PV =Inspected and Possible Vlolatlona Noted PB =Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />ORIGINAL -PUBLIC FILE <br />