Laserfiche WebLink
• Colorado Divrslon of Minerals and Geo~y <br />ESTIMATING FORM - BUI.LDO ZER WORK <br />Task p: 1 Prep. by: iA5 Task Fi 1e Name: M304-1 <br />Date: 11/1]/9] Permit q:M-]]-704 Mine: Rex Quarry <br />____________ _________ _________________________________ <br />Permit Action: Frnal Reclama[ron <br />_____________________________________________________________ <br />Task Description: Push ridge top sporls down into pit <br />HOURLY EQUIPMENT COST <br />......~ .............. Basic Machine: Cac D9N No rse power: 3]0 <br /> Blade Type: UNIVERSAL <br /> Attachment pl~ RO PS Cab Shift Basis: 1/day <br /> Attachment q2: N/A ~~~ <br />Cost Breakdown: <br />"""'---"" Ut it uacion k <br />Ownership cost/hr = 53].81 N/A <br />Operating s overhaul cost/hr- dozer 575.30 100 <br /> -ripper = $O.DO N/A <br />Operator cost/hr 522.95 N/A <br />Total egpc. unit cost/hr 5136.06 io tal flee[ cost/hr: 5408.1] <br />________ ________ <br />MATERIAL QUANTITIES <br />Initial Sve11 Loose <br />Volume: 805,870.0 CCY Factor: 1.735 Volume: 1.0]5,836.5 LCY <br />____________ __________ _____________ <br />Source of quanc ity take-of E: permit <br />Source of est. swell factor: program <br />____________________________________________________ <br />HOURLY PRODUCTION <br />................. Job Condition Correction Factors <br />Avg. push distance: 450 f[. ~-----~~~~~~~~~~~~~~ ~~~~~~" " -- <br /> --------' Operator.......... 0 .]5 lavg.l <br />Una dj usced hourly Mat. consistency.. 1 .00 ICac cbll <br />dozer production: 757 LCY/h[ Dozing method..... 1 .20 (s-by-sl <br /> " " " "' Visibility..... .. 1 .00 (avg.l <br />Materral consistency : Job of Eicrency.... 0 .87 (lsh/dayl <br />[onsolydated stockpi le Spoil pile Factor. 1 .00 (doz-ocl <br />'--" " " " " " " " " '-" " " "" " " Push gradient..... 1 .43 (Cat [bll <br />Avg. push gradient: 20.00 k Ineg1 Altitude de rat ion. 1 .00 (Cat tb11 <br /> '----" " Material ve rg ht... 0 .90 (Cat tbll <br />Avg. site altitude: 6000 <br />_________ ft. Blade type........ <br />____________________ 1 <br />_________ .00 <br />___ (S or UI <br />Ma serial weigh[ 2550.00 16/LCY Net Job Cocrecc ion 0 .96 <br />Mat. Des cr.: _________ ________ ___ <br />Sa ndscone <br />____________________ <br />_________ <br />________ Adjusted Uni[ Prod.: 338 <br />________ .74 <br />___ LCY/hr <br /> Adjusted Fleet Production: 1016 .22 LCY/hr <br />JOB COST '-"'~~~ ~'- <br />Fleet size 3 <br />________ Dozer lsl Total Job Time: 1058 <br />________ .6fi <br />___ Hours <br />Unit CosC 50.402 <br />________ /LCY Total Job CosC. $912,109 <br />________ .]7 <br />___ <br />