Laserfiche WebLink
• Colorado Divis ron of Minerals and Geo~ <br />ESTIMATING FORM - BULL002ER WORK <br />Task p: 3 Prep. by: TAS Task File Name: M309-7 <br />Date: 11/1]/97 Permit p: M-]]-304 Mine: Rez Quarry <br />Permit Action: Final Reclamation <br />Task Description: Res pread topsoil, beet dirt, and fines <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DBN <br />Blade type: UNIVERSAL <br />Attachment pl: RO PS Cab <br />Attachment p2: N/A <br />Hots epowet: 285 <br />$h lfL Bds 19: 1/ddy <br />Cos[ Breakdown: <br />" " " "" " " Utilizat ron t <br />Ownership cos[/hr = 576. 59 N/A <br />Operating 6 overhaul cos[/hr- dozer = 552. 51 100 <br />-ripper 50. 00 N/A <br />Operator cost/hr = 522. 95 N/A <br />Total egpt. unit cos c/hr = $112. <br />______ 05 <br />__ Total fleet cost/hr: 5112.05 <br />________ <br />MATERIAL QUANTITIES <br />In is ial Swell Loose <br />Volume: 57,811.0 LCY Factor: N/A Volume: 57,811.0 LCY <br />____________ __________ _____________ <br />Source of goon[ icy take-off: permit <br />______________________________________________ <br />Source o£ est. swell Ea cc or: program <br />HOURLY PRODUCTION <br />•••_•_•____•..... Job Cond nC ion Correction Factors <br />Avg. push disco nce: 250 Et. "~---""'-----"-"""""~~' <br />" " " "' Opezaco r.......... 0.]B (avg.) <br />Unadjusted hourly Mat. consistency.. 1.20 (Cat tbll <br />dozer production: 920 LCY/hr Dozing method..... 1.20 (slot) <br /> " " " "' Visibility........ 1.00 (avg.) <br />Material consistency : Job effic rency.... 0.87 (lsh/dayl <br />Loose stockpile Spoil pile factor. 0.80 (fnd-rf) <br />" " " " " " ""--'- --' Push gradient..... 1.J7 (Cat tb 11 <br />Avg. push gradient: 15.00 k Ineg1 Altitude dera Lion. 1.00 (Cat tbl) <br />Avg. site altitude <br />Material weight <br />Mat. Descr.: <br />GENERAL FILL <br />JOB COST <br />Fleet size <br />1 Do zer ls) <br />Unit Cosc 50.280 /LCY <br />'-'-"--- Material weight... 1 .00 ICat tbl) <br />6000 fc. Blade type........ 1 .00 (S or U) <br />2700.00 lb/LCY Net Job Correction <br />_________ __ 0 <br />______ .95 <br />___ <br />Adz us ted Unit Prod.: <br />___________________ __ 900 <br />______ .56 <br />___ LCY/hr <br />Adjusted Fleer Production: 400 .56 LCY/hr <br />To cal Job Time: 144.77 Hours <br />Total Job Cost: 516,1]1.85 <br />