Laserfiche WebLink
III. COMMENTS-COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Coal Gulch Mine conducted by of the Colorado Division of Minerals and <br />Geology. No one else was present. <br />The permit for this mine was revoked more than 10 years ago. DMG's IML program had reclamation work done <br />on the site in September 1994. <br />The ground was wet <br />Hydroloaic Balance <br />The lower pond was dry. As mentioned in past inspection reports, the lower pond has the remnants of the inlet of <br />a primary spillway culvert, but the outlet on the outslope of the embankment could not be found. <br />Slides and Damaee <br />No slope stability problems or new erosion were evident. <br />Reclamation Success <br />There is a fair amount of vegetation cover on the disturbed areas, and several patches of thistle that cover several <br />hundred square feet on the site. <br />