My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC12891
DRMS
>
Back File Migration
>
Inspection
>
INSPEC12891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:14:34 PM
Creation date
11/18/2007 8:58:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
Inspection
Doc Date
6/30/2003
Doc Name
Response to inspection problems
From
MA Concrete Construction Inc
To
DMG
Inspection Date
5/13/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEI!/E® <br />M.A. CONCRETE CONSTRUCTION, INC. r/- <br />2323 RIVER ROAD <br />GRAND JUNCTION, CO 81505 <br />Steve Shuey <br />Division Of Minerals & Geology <br />101 South 3rd Street <br />Room 301 <br />Grand Junction, Co 81501 <br />Dear Steve <br />June 27, 2003 <br />JUL. i.4 ~t <br />0ivisiao at Mlnarela aaJ Gaaia~y <br />Rt~oeived <br />JUN 3 02003 <br />ttrand ,Imw~on ~ OfRae <br />nhrlNrm e1 t1RAierela !b <br />r~spss~ ~ - s-t3ro3 i.,rP. ~~.6t...s <br />Concerning the problems n~o~~e~your report~ated June 17, 2003, from the inspection of <br />Monument View Gravel l~tie, M-2000-032, dated May 13, 2003. We propose the following <br />measures to be taken to correct the problems noted in your report. <br />1. The berms on the north side of the mined area have a very thick crust on them and the adjacent <br />fence to the north has fabric approximatly 6' high. "There is no blow dirt against the fence which <br />tells me that the beans on the north are stabilized by the existing crost. We do shoot all stock piles <br />with water while spraying the haul roads and staging areas. <br />We are at present building a mad on the south side of the high wall on the north side of the <br />mined area. This will allow us access to this area, and we will be able to spray these berms if need <br />to aleviate any problem from blowing dirt. <br />2. Will address at a later date. <br />3. As mentioned above, we are at present building a road along the north highwall. When <br />complete this will give us slopes of 3H:1 V minimum. This will stabilize the north high wall <br />against arty movement and protect all man made structures to the north. This will be complete <br />by August 1, 2003. We will bring pictures to you as soon as completed. <br />If more information is needed please contact me at 970-243-3221, or my cell # is 250-8050. <br />Sincerely <br />Jay L.Ingelhart <br />Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.