My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC12710
DRMS
>
Back File Migration
>
Inspection
>
INSPEC12710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:14:26 PM
Creation date
11/18/2007 8:57:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
11/18/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />segment. Bob Shevling indicated that the matter would be addressed within a technical <br />revision application to be submitted shortly. <br />At the "A" and "B" Pit areas, Pond 006 was full and discharging approximately 50 gpm of <br />clear water. Water was spilling over the top of the spillway riser. The operator indicated <br />that additional work had been undertaken to repair the spillway leak associated with the <br />recently installed riser extension, mentioned in the previous inspection report. Because <br />water was spilling over the top of the riser, it could not be determined with certainty that <br />the leak had been completely eliminated. The operator needs to confirm that the leak has <br />been eliminated and that the spillway is functioning as designed. The Phase V construction <br />certification for the pond needs to be submitted promptly. <br />The pre-settling basin was still intact within the lower segment of the "B" Pit. The basin <br />contained a pool of water approximately 3 feet below the level of the spillway. The <br />remaining portion of the "B" Pit including the pre-settling basin is to be backfilled and the <br />area is to be re-graded by the end of the year. The Pond 006 Phase V design is required to <br />be in place and fully functional prior to elimination of the pre-settling basin. Construction <br />certification documenting Phase V compliance is to be submitted promptly, and prior to <br />elimination of the pre-settling basin. <br />Pond 015 had a slushy ice cover; water level was at the spillway elevation with a trickle of <br />clear discharge. There was evidence of recent beaver activity along the bank but the <br />spillway was open and functional. <br />Pond 009 was iced over approximately 4 feet below the top of the primary spillway riser; <br />no discharge. <br />Pond 016A contained a shallow puddle. There are surficial slumps with associated scarps <br />at either end of the pond inslope, along the east side of the long narrow pond. The slumps <br />are contained within the immediate pond area, which was previously stripped of topsoil. <br />The scarps appear to be above the maximum water elevation and the slides do not appear <br />to have impacted the storage capacity of the pond. The pond has not yet been certified but <br />the operator has committed to include the construction certification within a technical <br />revision application to be submitted before the end of the year. The pond embankment and <br />adjacent disturbed areas had recently been seeded. <br />Efforts to seal the damaged monitoring wells immediately down-gradient from the toe of the <br />Pond 016A embankment have not been successful. The previously excavated trench in the <br />well location has been filled in with gravel to create a french drain, which appears to be <br />functioning properly. Water emerging from the ground and from the well casings flows <br />through the french drain directly into Pond 016 below. Next spring, the operator plans to <br />try to pull out the well casings and pump concrete down the holes to seat the welts. <br />Pond 16 was full with a thin ice cover. There was flow over the top of the spillway riser, <br />with a discharge of clear-water approximately 30 gpm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.