Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />Two enforcement actions, CV-2003-014 and CV-2003-015, were taken as a result of this <br />inspection. Abatement requirements and time frames are specified here below. There are <br />no outstanding NOV abatements from previous inspections. <br />CV-2003-014 <br />The Remedial Abatement (Step 1), is to Submit a detai/ed repair p/an /Minor Revision) <br />addressing stabi/ization measures to be emp/oyed on gullies described under Portion of the <br />Operation...' /nc/ude commitment to a/iminate old contour ditches that have caused or <br />exacerbated gully erosion. Submit Plan by 1-9-04. <br />Final Abatement (Step 2), is to /mp/ement and Comp/ete approved p/an required by Step 1, <br />by February 19, 2004. <br />CV-2003-015 <br />Abatement is to Submit a complete technical revision with a properly amended aspen study <br />plan Appendix 22-3 and associated Tab 22 narrative. The plan amendments wi/l need to <br />include necessary modifications to the study schedule, planting stock, and procedures. <br />Abatement deadline is January 9, 2004. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2/97 <br />12 <br />