Laserfiche WebLink
~' ~y ~3 ~~ <br />Backfilling and Grading: -The backfilled areas remain stable. No cracking or settling <br />has been observed in the backfilled areas. There were no erosional problems <br />observed on these areas. <br />Processing Waste: The recently covered portions of the refuse pile remain stable. <br />There were no signs of erosion on the newly reclaimed slopes of the pile and very <br />little sediment was deposited in the 100-year ditch around the refuse pile or at the <br />inlet to Pond 4. <br />Revegetation/Reclamation Success: Some of the cover crop (oats) that was seeded <br />last year appears has come up on the recently regraded portion of the refuse pile, <br />the facilities area, pond 3, the roadside topsoil stockpile area and the explosives <br />bunker. In addition, there are numerous other grasses and weeds that have grown <br />on these areas. Final seeding of the new reclamation is planned for this fall. The <br />vegetation at the loadout has begun to turn brown. The cover appears to be the <br />same as that of the surrounding areas. <br />