Laserfiche WebLink
--~ I • • <br />of they 9360 Level pad will be sloped to the surrounding topography, <br />fertilized and reseeded with the previously discussed seed mixture. <br />to <br />jn~ermittent drainage through {Vindy Gulch will be diverted <br />I M~ <br />raround all waste dumps to prevent Dollution of water re- <br />es will be <br />in- <br />filed. <br />E-SB ermit Area B - All areas possible within Area B will be re- <br />claimed to wildlife habitat. All tanks, pipelines, launders and build- <br />ings v~ill be dismantled and removed except for the main water tanks <br />and u derground pipeline systems. These facilities will be donated <br />to th City of Creede or Mineral County Fire District. <br />The tailings pond will require a least two years to dry <br />out sufficiently for the operation of heavy equipment over the sur- <br />face.l The surface will be graded level just below the high water <br />conto r as shown in EXHIBIT D-l. The berm face has already been <br />reveg fated and stabilized. After grading, wood pulp, straw (or <br />hay) ill be applied at the rate of 2 tons per acre and disced into <br />the tdp six inches to prepare a suitable seed bed and prevent ex- <br />cessi~le evaporation and erosion. Following bed preparation, ferti- <br />lizer, quick-germinating annual grasses and perennial grasses will <br />be pla~nnted in October at the rates of 200 and 45 pounds per acre <br />respe lively. Forest Service specified seed mixtures, as well as <br />- 23- <br />