Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of ob<;ervations <br />made during the inspection. Comments also describe any enforcement actions ttaken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />On June 14, 1995 a partial inspection was conducted at the Golden Eagle Mine. Present during <br />the inspection was Ralph Lopez. The weather was clear and warm. <br />The Division had received a telephone call on June 8 from Mr. Presengit Bose. He said that the <br />mine had inadvertently cleared an area for developmental drilling prior to receiving Division <br />approval on his property. During this inspection the 35 acre property (3C-11) owned by Mr. <br />Bose was inspected. The property had an area of about 40 x 40 feet cleared of vegetation for yhe <br />drill pad. This was mulched and seeded. Photographs were taken. The operator said that this <br />drill site (#86) is part of a technical revision awaiting Division approval. The area w•as <br />accidentally cleared and the mistake was caught before drilling started. When the mistake was <br />noted the land owner was notified. The area was recovered with topsoil, mulched and seeded. <br />Photos were taken of the area. <br />The Drill pad for the borehole (#26) that was drilled last year was inspected. This area was <br />topsoiled, netted and mulched. Some vegetation was coming up with a few wild flowers. The site <br />of proposed drillhole #87 that is also on the Bose property was also inspected. <br />