Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3567 <br />FAX: 13031 832.8106 <br />I <br />~~} ~~~, __ T v~ tsk, <br />MEMO ~~~,'` •~~ ~? „fl ,! ~, <br />D I V l 5! O N O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br /> INFORMATION, MINERALS PROGRAM Bill Owens <br /> /,~ f~ Governor <br />TO: Jim Stevens Berhan Keffelew l / <br />f Greg E Watcher <br />Ezecunve Director <br /> <br />FROM <br />HBH f ~~)j Michael B. Long <br />Drvia~on Diecor <br />: / <br />DATE: December 1, 2000 <br />RE: Daniels Sand Pit #2 <br />I reviewed the materials submitted to me on the Daniels Sand Pit #2, the [vies and [he Act. It is <br />my belief that the water treatment facility that has been constructed on the mine site and owned <br />by the Schlage Locks Company is outside our jurisdiction. My reading of the Act and Rules is <br />that the protective provisions of these sections apply where an operator will or may impact an <br />existing facility that was in-place at the time of application or amendment submittal. In other <br />words the act protects existing structures at the time of permitting. Anything that occurs after the <br />fact seems to me to be the responsibility of the person constructing the factlity to ensure that the <br />structure Is protected. The provision says that we may deny a permit, not take one away. The <br />situation is different where an operator does not disclose a facility or mines outside the approved <br />affected area and encroaches within 200 feet of some structure. In the first instance, the <br />approved permit is put in jeopardy, and the second is a possible violation. <br />In this case the operator (who is also the landowner) was approached by Schlage for permission <br />to install the water treatment facility. So Schlage was well aware of the potential for impacts due <br />to mining, based on the placement of the water treatment facility. They have an agreement that <br />looks to cover theirjoint activities. If there is a violation of that agreement, they may go to court <br />to have disputes resolved. <br />Schlage is also supposed to move their facilities prior to mining. This is the one area where I <br />believe the state and operator have exposure. I would recommend that the operator submit a TR <br />[hat commits to no mining through the area containing the facilities until the facilities have been <br />"reclaimed" to the extent necessary so as to not result in a liability to the state. For example, any <br />well must be properly plugged according [o standards of the State Engineer prior to mining <br />activity occurring. We must have acceptable documentation as well. I will leave it up to you <br />and Berhan to decide if there are other areas that need "reclamation" prior to disturbance by <br />mining. <br />As always, I would appreciate your thoughts. <br />