Laserfiche WebLink
r <br />COAL BOND COMPLIANCE INSPECTION FORM <br />Mine1171x11 C~,Q ~IVL~ <br />Permit No. (~,-~ ~-Q ~ <br />Date ~T~ ~ C{ (p <br />Permittee (;~U~,fR.lrll ice.( ~/7 /~• <br />Operator <br />Inspector // ,(,/ ,(,i'~~j7x <br />~- <br />Part 1 - Contemporaneous Reclamation - To be completed at least annually <br />Backfi[ling and Grading <br />Compare the following field conditions to approved plans using the reclamation cost estimate, <br />mine plan operations plan maps, post-mining topography maps, and maps from annual reclama- <br />tion reports, etc. Write a brief description of any observed discrepancies. <br />1. NumCbe_r^of onpe1n pits, portals, mine shafts, and/or adits. C3 <br />G~-~~ YI F <br />l~~esr P14- <br />~. Icy Plf <br />l.a. Approximate dimensions of pits/openings. <br />~iof Pik- 5,00' ~.a,4>~'-1,cY~u~}~~d. <br />~,. ll~ Pifi-51~o'c..~- ~o~~ ~ ~'-i~v'd . <br />2. Number of spoil ridges at each pit, or time elapsed since the pit was last active. <br />~r,ot Pi ~ <br />~.e, i~. P~+- <br />3. Are there existing subsidence features that require backfilling and grading? <br />N~ <br />4. List refuse areas and their locations. <br />NIA <br />