My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC12423
DRMS
>
Back File Migration
>
Inspection
>
INSPEC12423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:14:14 PM
Creation date
11/18/2007 8:55:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Inspection
Doc Date
10/4/1996
Doc Name
COAL INSPECTION REPORT
Inspection Date
9/30/1996
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
la <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />Reveoetation <br />Some stabilization seeding is to be done this fall on portions of <br />the upper diversion ditch at CRDA-2, and certain perimeter areas <br />which were disturbed last year in association with the North Portal <br />Coal Handling Area modifications. Also, remedial final <br />reclamation seeding will be conducted on North Decline areas near <br />the permanent channel which were regraded earlier this year, as <br />well as additional strips which will be seeded within previously <br />reseeded areas at the North Decline, in an attempt to increase the <br />perennial grass and forb component of the stand, which is currently <br />dominated by shrubs and cheatgrass. Compacted soils will be <br />loosened and roughened by ripping with a dozer prior to seeding. <br />It was noted that grasses on reclaimed portions of the refuse <br />disposal areas have exhibited substantial regrowth in response to <br />precipitation received in recent weeks. <br />Subsidence <br />The three recently installed subsidence monuments along Jerry Creek <br />and two monuments adjacent to Coal Creek, were inspected and <br />appeared to be installed in accordance with permit requirements. <br />PVC pipe segments associated with the roof bolt monument <br />installations were painted tan per BLM stipulation. At several of <br />the sites, the PVC segment had been cut off level with the top of <br />the steel monument, and the PVC segments at the remaining locations <br />will be similarly modified. Initial survey of the Jerry Creek <br />subsidence monuments will need to be completed by mid October, <br />and results submitted to the Division, along with documentation <br />that the initial monitoring was completed prior to any possible <br />manifestation of subsidence. <br />The agricultural field on Powder Mountain Ranch property above the <br />South Portal workings was observed. As was the case in late June, <br />there was no water running in the irrigation ditch or stored in the <br />pond above the field. The field does not appear to have been <br />irrigated this year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.