Laserfiche WebLink
III. COMMENTS -COMPLIANCE ,~ ~r^,r, r/-gO -0O~ <br />Below are comments on the inspection. The comments include discussi n of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Hayden Gulch Mine conducted by Jim Stark of <br />CDMG. The mine site is reclaimed. The weather was warm and clear with a bit of <br />wind and the ground was wet and muddy in spots but mostly dry. The majority of the <br />snow has melted with just a small amount of snow remaining above shrub plot above <br />pond HG-8 and a small amount on the slope where the 1994 slump occurred. <br />Signs and Markers: The permit boundary markers around the shrub plots were up and <br />in good condition. <br />Roads: The access roads to the shrub parcel areas were a bit muddy but appeared <br />to be stable and in good condition. These roads are permitted as permanent roads <br />and are no longer a part of the permit. <br />Hvdroloaic Balance: -Both remaining ponds are permitted to be permanent. <br />Although they are within the shrub parcels they are no longer a part of the permit. <br />- Pond 003 contained water but was not discharging. The pond appeared to be <br />stable at the time of the inspection. <br />- Pond HG-8 also contained water. This pond was not discharging either. The pond <br />appeared to be stable at the time of the inspection. <br />Fish and Wildlife: No wildlife was observed at the site during this inspection. <br />Revegetation/Reclamation Success: All three shrub parcels appeared to be in good <br />condition. The grasses were beginning to grow and turn green. The fences around <br />the shrub parcels were up and in good condition. <br />Slides and Damage: The steel stakes that have been placed across the slump area <br />were in alignment and the area appeared to be stable, The two west side exits for <br />the French drain were discharging a small amount of water and the rocks along the <br />riprapped channel were wet, There was still a small amount of snow remaining on <br />parts of the slide area. <br />