My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC12300
DRMS
>
Back File Migration
>
Inspection
>
INSPEC12300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:14:07 PM
Creation date
11/18/2007 8:55:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Name
Blast Record Analysis 2/16/2003
From
Scott Crellin
To
Byron Walker
Inspection Date
4/15/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walker, Byron <br />From: Scott, Crellin (KEC) [ScottC@kenergy.com] <br />Sent: Tuesday, April 15, 2003 3:50 PM <br />To: Walker, Byron <br />Cc: Hinkemeyer, Stephen (KEC) <br />Subject: RE: Analysis of February 16, 2003 Bfast <br />~~ Ictv4/-c'(~ <br />Dear Mr. Walker, <br />Thank you for your revised and corrected reconstruction (Dated April 09, 2003) of the <br />subject blast. Colowyo has made a review of the reconstruction and has determined that <br />your reconstruction is accurate and correct. If we can be of any other assistance in this <br />matter please call me at your convenience. <br />Sincerely, <br />Crellin Scott <br />CONFIDENTIAL and PROPRIETARY information of Kennecott Energy Company (C) 2002. All rights <br />reserved. This work contains information that is confidential and proprietary to Kennecott <br />Energy Company. The senders contact information is also protected by the Kennecott Energy <br />Company Data Protection Policy, and should not be circulated. Removal of this notice, use, <br />transfer, republication, disclosure and/or copying of all or part of this message, or its <br />attachments, is strictly prohibited, except with the express, written permission of <br />Kennecott Energy Company. If you have received this e-mail message in error please return <br />it and contact Crellin Scott at 970-824-1532. <br />-----Original Message----- <br />From: Walker, Byron [mailto:byron.walker@state.co.us] <br />Sent: Wednesday, April 09, 2003 12:51 PM <br />To: Scott, Crellin (KEC) <br />Cc: Hernandez, Dan <br />Subject: Analysis of February 16, 2003 Blast <br />Dear Mr. Scott, please find attached a revised and corrected (April 9, 2003) <br />reconstruction of the subject blast. These revisions and correctons were <br />made based on information provided by Colowyo, including the two 100 <br />millisecond delays before the A row, and the change in powder density for <br />specific holes. Please review the reconstruction, and provide me with any <br />corrections. In summary, the reconsrtuction indicates that there may have <br />been ninety-six 8-millisecond delays where more than the permitted <br />(scale-distance factor determination) amount of explosives were detonated. A <br />maximum of 7055 pounds within 8-milliseconds were apparently detonated near <br />794 (holes C-51, G-13, and D-42) and 838 (holes C-47, G-9, and D-38) <br />milliseconds into the blast. <br />«blast analysis time brackets revised and corrected.xls» «blast <br />analysis corrected & revised.xls» <br />
The URL can be used to link to this page
Your browser does not support the video tag.